About Us

Barun Hydropower Co. Ltd.

Barun Hydropower Company Ltd. (Earlier Barun Hydropower Development Company Ltd) is a limited liability company registered under the Company Act 2063 with an Authorized Share Capital of Rs 60 Crores. It has a paid up 26.79 crore. The company was established in 2060/10/06 (Reg. No. 2065/9/26) with a mission to develop, own and operate hydroelectric project and converted into public limited in 2066.

The company has in operation of 4.5 MW hydroelectricity project known as "Hewakhola Hydropower Project" at Sankhuwashava district.

Vision of the Company
“Brighten the nation by maximum utilization of water resources and bring prosperity to people through hydropower development”

Mission of the Company
“To identify different size of hydropower projects in Nepal, study, develop them and construct projects through peoples’ participation; generate, operate and own the projects and sharing benefits with people” is the mission of the company.

Date of Incorporation of Company: 2060/10/06

Company Registration no : 1154/065/066

PAN No: 301617998

PPA Date: 2064/06/02

Date of Conversion into Public Ltd: 2066/03/31

Project Completion Date: 2067/09/30

Commercial Operation Date: 2068/04/21